swarajyamag.com – The Road Transport and Highways sector has the maximum number of delayed projects at 248, followed by railways at 116 and petroleum sector at 88, as per the latest flash report on infrastructure proj…
Tweeted by @SwarajyaMag https://twitter.com/SwarajyaMag/status/1580572523611140096