swarajyamag.com – The Road Transport and Highways sector has the maximum number of delayed projects at 248, followed by railways at 116 and petroleum sector at 88, as per the latest flash report on infrastructure proj…

Tweeted by @SwarajyaMag https://twitter.com/SwarajyaMag/status/1580572523611140096

Leave a reply

วิชวาฮินดูปาริชาด (VHP)

ติดต่อเรา

919/449 Jewelry Trade Center, 37th Floor, Unit H-2, Silom Rd., Bangrak, Bangkok 10500, Thailand

ลิงค์ด่วน

Generated by Feedzy