swarajyamag.com – It was the only link connecting the two locations until a new road bridge was built parallel to the sea link in 1988. “Sub structure work has been completed fully which includes 333 Piles and 101 Pil…
Tweeted by @SwarajyaMag https://twitter.com/SwarajyaMag/status/1599405411572015105