swarajyamag.com – The length of these two expressway sections are 65.5 km and 71 km. They will be developed at a cost of Rs 2,000 crore and Rs 2,100 crore respectively. While PNC Infratech is constructing the 71 km se…

Tweeted by @SwarajyaMag https://twitter.com/SwarajyaMag/status/1615992875506106368

Leave a reply

วิชวาฮินดูปาริชาด (VHP)

ติดต่อเรา

919/449 Jewelry Trade Center, 37th Floor, Unit H-2, Silom Rd., Bangrak, Bangkok 10500, Thailand

ลิงค์ด่วน

Generated by Feedzy