swarajyamag.com – The 13.75 km Metro line which will run between K.R. Puram and Whitefield is expected to be ready by 10 March 2023. This information was conveyed by the Bengaluru Metro Rail Corporation Limited (BMRCL…
Tweeted by @SwarajyaMag https://twitter.com/SwarajyaMag/status/1632653292999409664