{"id":6153,"date":"2022-07-04T03:51:29","date_gmt":"2022-07-04T03:51:29","guid":{"rendered":"https:\/\/vhpthailand.org\/2022\/07\/04\/ntpc-to-build-10000-mw-renewable-energy-project-in-rajasthan-to-help-reach-its-60000-mw-clean-power-target-by-2032\/"},"modified":"2022-07-04T03:51:29","modified_gmt":"2022-07-04T03:51:29","slug":"ntpc-to-build-10000-mw-renewable-energy-project-in-rajasthan-to-help-reach-its-60000-mw-clean-power-target-by-2032","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2022\/07\/04\/ntpc-to-build-10000-mw-renewable-energy-project-in-rajasthan-to-help-reach-its-60000-mw-clean-power-target-by-2032\/","title":{"rendered":"NTPC To Build 10,000 MW Renewable Energy Project In Rajasthan, To Help Reach Its 60,000 MW Clean Power Target By 2032"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; NTPC Renewable Energy Limited (NTPC REL), a wholly-owned subsidiary of NTPC, has signed a Memorandum of Understanding (MOU) with the Government of Rajasthan for the development of a 10 GW (10,000 MW)\u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1543471746422304768<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; NTPC Renewable Energy Limited (NTPC REL), a wholly-owned subsidiary of NTPC, has signed a Memorandum of Understanding (MOU) with the Government of Rajasthan for the development of a 10 GW (10,000 MW)\u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1543471746422304768<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/6153"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=6153"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/6153\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=6153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=6153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=6153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}