{"id":6022,"date":"2022-07-02T07:13:06","date_gmt":"2022-07-02T07:13:06","guid":{"rendered":"https:\/\/vhpthailand.org\/2022\/07\/02\/ntpc-commissions-indias-largest-floating-solar-project-in-telangana\/"},"modified":"2022-07-02T07:13:06","modified_gmt":"2022-07-02T07:13:06","slug":"ntpc-commissions-indias-largest-floating-solar-project-in-telangana","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2022\/07\/02\/ntpc-commissions-indias-largest-floating-solar-project-in-telangana\/","title":{"rendered":"NTPC Commissions India&#8217;s Largest Floating Solar Project In Telangana"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; NTPC Ltd has declared the Commercial Operations Date (COD) of the last part capacity of 20 MW out of 100 MW Ramagundam Floating Solar PV Project in Telangana. Ramagundam Floating Solar PV Project is \u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1542816532790534144<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; NTPC Ltd has declared the Commercial Operations Date (COD) of the last part capacity of 20 MW out of 100 MW Ramagundam Floating Solar PV Project in Telangana. Ramagundam Floating Solar PV Project is \u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1542816532790534144<\/p>","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/6022"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=6022"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/6022\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=6022"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=6022"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=6022"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}