{"id":11243,"date":"2023-03-30T03:10:49","date_gmt":"2023-03-30T03:10:49","guid":{"rendered":"https:\/\/vhpthailand.org\/2023\/03\/30\/ntpcs-renewable-energy-arm-to-supply-1-3-gw-clean-power-for-greenkos-upcoming-green-ammonia-plant-at-kakinada\/"},"modified":"2023-03-30T03:10:49","modified_gmt":"2023-03-30T03:10:49","slug":"ntpcs-renewable-energy-arm-to-supply-1-3-gw-clean-power-for-greenkos-upcoming-green-ammonia-plant-at-kakinada","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2023\/03\/30\/ntpcs-renewable-energy-arm-to-supply-1-3-gw-clean-power-for-greenkos-upcoming-green-ammonia-plant-at-kakinada\/","title":{"rendered":"NTPC&#8217;s Renewable Energy Arm To Supply 1.3 GW Clean Power For Greenko&#8217;s Upcoming Green Ammonia Plant At Kakinada"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; NTPC Renewable Energy Limited (NTPCREL) has said that it will supply 1300 MW (1.3 GW) clean power for powering Greenko\u2019s upcoming Green Ammonia Plant at Kakinada, Andhra Pradesh. NTPC Renewable Energ\u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1641084042484301825<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; NTPC Renewable Energy Limited (NTPCREL) has said that it will supply 1300 MW (1.3 GW) clean power for powering Greenko\u2019s upcoming Green Ammonia Plant at Kakinada, Andhra Pradesh. NTPC Renewable Energ\u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1641084042484301825<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/11243"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=11243"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/11243\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=11243"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=11243"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=11243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}