{"id":11010,"date":"2023-03-07T03:07:14","date_gmt":"2023-03-07T03:07:14","guid":{"rendered":"https:\/\/vhpthailand.org\/2023\/03\/07\/bengaluru-kr-puram-whitefield-metro-line-to-be-ready-by-10-march-commercial-operations-to-begin-after-go-ahead-from-cmrs\/"},"modified":"2023-03-07T03:07:14","modified_gmt":"2023-03-07T03:07:14","slug":"bengaluru-kr-puram-whitefield-metro-line-to-be-ready-by-10-march-commercial-operations-to-begin-after-go-ahead-from-cmrs","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2023\/03\/07\/bengaluru-kr-puram-whitefield-metro-line-to-be-ready-by-10-march-commercial-operations-to-begin-after-go-ahead-from-cmrs\/","title":{"rendered":"Bengaluru: KR Puram-Whitefield Metro Line To Be Ready By 10 March; Commercial Operations To Begin After Go-Ahead From CMRS"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; The 13.75 km Metro line which will run between K.R. Puram and Whitefield is expected to be ready by 10 March 2023. This information was conveyed by the Bengaluru Metro Rail Corporation Limited (BMRCL\u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1632653292999409664<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; The 13.75 km Metro line which will run between K.R. Puram and Whitefield is expected to be ready by 10 March 2023. This information was conveyed by the Bengaluru Metro Rail Corporation Limited (BMRCL\u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1632653292999409664<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/11010"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=11010"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/11010\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=11010"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=11010"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=11010"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}