{"id":10970,"date":"2023-03-03T03:06:37","date_gmt":"2023-03-03T03:06:37","guid":{"rendered":"https:\/\/vhpthailand.org\/2023\/03\/03\/haryana-orbital-rail-corridor-pnc-infratech-wins-contract-to-build-26-km-stretch-between-dhulawat-and-new-patli-station\/"},"modified":"2023-03-03T03:06:37","modified_gmt":"2023-03-03T03:06:37","slug":"haryana-orbital-rail-corridor-pnc-infratech-wins-contract-to-build-26-km-stretch-between-dhulawat-and-new-patli-station","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2023\/03\/03\/haryana-orbital-rail-corridor-pnc-infratech-wins-contract-to-build-26-km-stretch-between-dhulawat-and-new-patli-station\/","title":{"rendered":"Haryana Orbital Rail Corridor: PNC Infratech Wins Contract To Build 26-Km Stretch Between Dhulawat And New Patli Station"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; Infrastructure company PNC Infratech has bagged the contract to construct the 25.92 km Package C-23 of the 121.74 km Haryana Orbital Rail Corridor (HORC) project. This section of Haryana\u2019s first semi\u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1631232029273587713<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; Infrastructure company PNC Infratech has bagged the contract to construct the 25.92 km Package C-23 of the 121.74 km Haryana Orbital Rail Corridor (HORC) project. This section of Haryana\u2019s first semi\u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1631232029273587713<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10970"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=10970"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10970\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=10970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=10970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=10970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}