{"id":10689,"date":"2023-02-03T03:08:49","date_gmt":"2023-02-03T03:08:49","guid":{"rendered":"https:\/\/vhpthailand.org\/2023\/02\/03\/30-large-hydro-electric-projects-with-installed-capacity-of-11137-mw-being-developed-in-himalayan-region-govt\/"},"modified":"2023-02-03T03:08:49","modified_gmt":"2023-02-03T03:08:49","slug":"30-large-hydro-electric-projects-with-installed-capacity-of-11137-mw-being-developed-in-himalayan-region-govt","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2023\/02\/03\/30-large-hydro-electric-projects-with-installed-capacity-of-11137-mw-being-developed-in-himalayan-region-govt\/","title":{"rendered":"30 Large Hydro Electric Projects With Installed Capacity Of 11,137 MW Being Developed In Himalayan Region: Govt"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; The government on Thursday (2 February) said that 30 large hydro-electric power projects with installed capacity of over 11,000 megawatt (MW) are being developed in the Himalayan region. Further, the\u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1621097780973572098<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; The government on Thursday (2 February) said that 30 large hydro-electric power projects with installed capacity of over 11,000 megawatt (MW) are being developed in the Himalayan region. Further, the\u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1621097780973572098<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10689"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=10689"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10689\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=10689"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=10689"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=10689"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}