{"id":10281,"date":"2022-12-30T03:06:55","date_gmt":"2022-12-30T03:06:55","guid":{"rendered":"https:\/\/vhpthailand.org\/2022\/12\/30\/ntpc-commissions-second-part-capacity-of-300-mw-nokhra-solar-power-plant-in-rajasthan\/"},"modified":"2022-12-30T03:06:55","modified_gmt":"2022-12-30T03:06:55","slug":"ntpc-commissions-second-part-capacity-of-300-mw-nokhra-solar-power-plant-in-rajasthan","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2022\/12\/30\/ntpc-commissions-second-part-capacity-of-300-mw-nokhra-solar-power-plant-in-rajasthan\/","title":{"rendered":"NTPC Commissions Second Part Capacity Of 300 MW Nokhra Solar Power Plant In Rajasthan"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; India&#8217;s largest power generator NTPC has commissioned the second part capacity of 300 MW Nokhra solar power plant in Rajasthan, taking the total commissioned capacity to 150 MW. The state-owned compa\u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1608372246313066499<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; India&#8217;s largest power generator NTPC has commissioned the second part capacity of 300 MW Nokhra solar power plant in Rajasthan, taking the total commissioned capacity to 150 MW. The state-owned compa\u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1608372246313066499<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10281"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=10281"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10281\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=10281"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=10281"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=10281"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}