{"id":10194,"date":"2022-12-21T03:06:28","date_gmt":"2022-12-21T03:06:28","guid":{"rendered":"https:\/\/vhpthailand.org\/2022\/12\/21\/ntpc-commissions-first-part-of-300-mw-nokhra-solar-pv-project-in-rajasthans-bikaner\/"},"modified":"2022-12-21T03:06:28","modified_gmt":"2022-12-21T03:06:28","slug":"ntpc-commissions-first-part-of-300-mw-nokhra-solar-pv-project-in-rajasthans-bikaner","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2022\/12\/21\/ntpc-commissions-first-part-of-300-mw-nokhra-solar-pv-project-in-rajasthans-bikaner\/","title":{"rendered":"NTPC Commissions First Part Of 300 MW Nokhra Solar PV Project In Rajasthan&#8217;s Bikaner"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; India&#8217;s largest power generator NTPC has commissioned the first part capacity of 100 megawatt (MW) out of 300 MW Nokhra solar power plant in Rajasthan. &#8220;Consequent upon successful commissioning, firs\u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1605070150394580994<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; India&#8217;s largest power generator NTPC has commissioned the first part capacity of 100 megawatt (MW) out of 300 MW Nokhra solar power plant in Rajasthan. &#8220;Consequent upon successful commissioning, firs\u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1605070150394580994<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10194"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=10194"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10194\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=10194"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=10194"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=10194"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}