{"id":10058,"date":"2022-12-09T03:06:28","date_gmt":"2022-12-09T03:06:28","guid":{"rendered":"https:\/\/vhpthailand.org\/2022\/12\/09\/india-to-build-new-transmission-lines-with-rs-2-4-lakh-crore-for-upcoming-2030-target-of-500-gw-renewable-energy-capacity\/"},"modified":"2022-12-09T03:06:28","modified_gmt":"2022-12-09T03:06:28","slug":"india-to-build-new-transmission-lines-with-rs-2-4-lakh-crore-for-upcoming-2030-target-of-500-gw-renewable-energy-capacity","status":"publish","type":"post","link":"https:\/\/vhpthailand.org\/th\/2022\/12\/09\/india-to-build-new-transmission-lines-with-rs-2-4-lakh-crore-for-upcoming-2030-target-of-500-gw-renewable-energy-capacity\/","title":{"rendered":"India To Build New Transmission Lines With Rs 2.4 Lakh Crore For Upcoming 2030 Target Of 500 GW Renewable Energy Capacity"},"content":{"rendered":"<p><strong>swarajyamag.com<\/strong> &#8211; \u201cThe Plan is a major step towards achieving the goal of integrating 500 GW of non-fossil fuel based capacity by 2030 by providing a broad plan of required transmission system for having 537 GW of Ren\u2026<\/p>\n<p>Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1600821492140298240<\/p>","protected":false},"excerpt":{"rendered":"<p>swarajyamag.com &#8211; \u201cThe Plan is a major step towards achieving the goal of integrating 500 GW of non-fossil fuel based capacity by 2030 by providing a broad plan of required transmission system for having 537 GW of Ren\u2026 Tweeted by @SwarajyaMag https:\/\/twitter.com\/SwarajyaMag\/status\/1600821492140298240<\/p>","protected":false},"author":0,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10058"}],"collection":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/types\/post"}],"replies":[{"embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/comments?post=10058"}],"version-history":[{"count":0,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/posts\/10058\/revisions"}],"wp:attachment":[{"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/media?parent=10058"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/categories?post=10058"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vhpthailand.org\/th\/wp-json\/wp\/v2\/tags?post=10058"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}